IDO Methodology

BFO Applied Methodology

  1. Initiation
  2. Deployment
  3. Operation and Upgrade

REQUIRMENT

PROJECT REQUIREMENTs

  • Evaluate new system budget
  • Analyze the company strategy and validate project
  • Evaluate current situation from process, system, technology and organizational view
  • Define objectives and project scope
  • Define project structure and high level planning for selection process

REQUIREMENT OUTPUTS (FS)

  • Link current and future projects in planning
  • Consider existing systems viability and integration
  • Plan reengineering approach and fit
  1. Big R – Perform first, then work into selection criteria
  2. Little R – Include high level future functionality desired into selection criteria, develop detail processes around package capabilities
  • Perform a cost/benefit analysis
  • Validate the feasibility study report across the organization
  • Assemble cross functional project team

INITIATION Main Tasks

Plan

  • Confirm project scope and objectives
  • Establish project team structure and refine staffing plan
  • Develop implementation strategy
  • Review technical infrastructure
  • Develop detailed analysis stage workplan and high level project plan

Analysis

  • Conduct and document “As Is” and “To Be” sessions
  • Perform Functional Gap Analysis and identify customizations
  • Develop conversion and interface strategy
  • Establish development and sandbox instances
  • Develop technical infrastructure requirements
  • Develop detailed design stage workplan

INITIATION Outputs

  • Project Scope
  • Reengineering Strategy
  • Workflow selection Plan
  • Feasibility Study Report

DEPLOYMENT Main Tasks

  • Develop prototype and conduct Conference Room Pilot
  • Conduct data mapping sessions
  • Define Detail Design Specifications for custom objects
  • Define Security Strategy
  • Design technical infrastructure
  • Define and implement testing and training environments
  • Prepare detailed construction workplan

DEPLOYMENT Main Tasks

  • Construct and unit test applications and customizations
  • Develop system and integration test plans
  • Conduct system, integration, and volume testing
  • Perform acceptance testing
  • Construct application security
  • Design and develop procedures and training materials
  • Review system capacity and refine technical infrastructure
  • Develop cutover plan
  • Approve/conduct final review of system

OPERATION & UPGRADE MAIN Tasks

  • Conduct training
  • Migrate programs and security profiles to production
  • Execute conversion programs and cutover plan
  • Post-implementation